Apeks Marine & EngineeringApeks Marine

Regulation & Inspection

MIRO G Refloated Off French Coast After 20 November Grounding

Malta-flagged bulk carrier MIRO G was refloated off France's Atlantic coast on 24 November after grounding on 20 November. No pollution was detected; a hull inspection follows.

Four-Day Salvage Ends

French authorities refloated the Malta-flagged bulk carrier MIRO G on Tuesday, 24 November 2026, four days after it ran aground on 20 November along France’s Atlantic coast in severe weather. According to gCaptain, the Atlantic Maritime Prefecture confirmed that the operation freed the ship from a beach near Lit-et-Mixe in the Landes department of southwestern France.

The 169-meter, 2011-built bulk carrier, with a deadweight of roughly 28,200 tonnes, was sailing without cargo when it dragged anchor in strong winds and heavy seas in the Bay of Biscay. A helicopter airlifted 19 of the vessel’s 22 crew members after the grounding. The captain and two crew members remained aboard to assist French authorities during the recovery.

A Coordinated Response

French military units, government agencies and private salvage contractors, including Les Abeilles International, supported the refloating operation with maritime, land and aerial resources. Crews rigged a 1,900-meter high-strength synthetic towline aboard the French emergency towing vessel Abeille Bretagne and worked to restore the grounded ship’s ballast pumping systems so they could reduce its draft before the pull.

Crews waited for better weather and more favourable tides. Forecasts indicated that high tide would add more than a meter of water compared with the conditions when the vessel grounded. The greater depth and reduced draft helped free the hull from the beach.

No Pollution Detected, Hull Inspection to Follow

After MIRO G cleared the beach, the French Navy deployed a Falcon 50 maritime surveillance aircraft to inspect the surrounding waters. The aircraft detected no marine pollution at the grounding site or along the vessel’s subsequent transit route.

Tugs mobilized through the Port of Bordeaux are escorting the ship to Le Verdon. Divers will inspect the hull underwater there to assess damage from the grounding and the days the vessel rested on the beach. French maritime authorities credited military and civilian teams with completing the recovery safely and without detected pollution.

What It Means for Owners and Managers

A grounding without pollution or reported structural failure can still leave damage that an inspection must assess. Tides and wave action can deform hull plates, damage shell and bottom shell, bend frames, or stress welds. Deck inspections may not show that damage, and it may appear only after the vessel returns to service or carries cargo.

Divers at Le Verdon will begin the assessment. Owners and insurers will typically seek a full condition assessment after the vessel is afloat and accessible, covering hull integrity, ballast-system function and machinery affected by the grounding or salvage operation. A documented independent assessment can establish the effects of four days aground alongside the clean pollution record and successful refloating.

Earlier coverage: Miro G Grounds Near French Coast in November 20 Storm, Crew Airlifted

Reviewed by Apeks Marine Editorial Team.

Source: gCaptain

Important Note

This article is compiled from public sources and was reviewed by the Apeks Marine editorial team on 26 November 2026. It is for general awareness only, and it is not legal advice, an official notice, or a substitute for the original source.

Request a Survey